Project Design Documents
Recycled Water Facilities
Draft Conceptual Design Report (CDR) - May 2025
Final Conceptual Design Report (CDR) - June 2025
Water Reclamation Facility
Water Reclamation Facility IFC Design Plans - May 2020 - Part 4
Water Reclamation Facility IFC Design Plans - May 2020 - Part 3
Water Reclamation Facility IFC Design Plans - May 2020 - Part 2
Water Reclamation Facility IFC Design Plans - May 2020 - Part 1
Water Reclamation Facility IFC Design Specifications - May 2020
Final Water Reclamation Facility Plan - April 2019
Water Reclamation Facility Stormwater Pollution Prevention Plan - June 2019
Water Reclamation Facility Final Grading Plans - October 2019 (City Approval)
Water Reclamation Facility Final Grading Plans - October 2019 (45 MB)
Water Reclamation Facility Yard Piping Specifications - December 2019
Water Reclamation Facility Yard Piping Plans - December 2019 (10 MB)
Water Reclamation Facility 90% Design Specifications - April 2020 (12 MB)
Water Reclamation Facility 90% Design Plans - April 2020 (209 MB)
Water Reclamation Facility 60% Design Specifications - July 2019 (11 MB)
Water Reclamation Facility 60% Design Plans - July 2019 (85 MB)
Water Reclamation Facility Basis of Design Report - May 2019
Conveyance Facilities
Bike Path Landscaping Conceptual Plan (2 MB)
Conveyance Facilities Conformed Drawings Volume 3 – December 2020 (144 MB)
Conveyance Facilities Conformed Specifications Volume 2 – December 2020 (10 MB)
Conveyance Facilities Conformed Specifications Volume 1 – December 2020 (4 MB)
Conveyance Facilities Final Bid Plans - June 2020 - Part 2
Conveyance Facilities Final Bid Plans - June 2020 - Part 1
Conveyance Facilities 90% Design Specifications - February 2020 (17 MB)
Conveyance Facilities 90% Design Plans - February 2020 (156 MB)
Conveyance Facilities 60% Design Plans - September 2019 (70 MB)
Conveyance Facilities Concept Design Report - May 2019 (20 MB)
Preliminary Engineering
Conceptual Wastewater Treatment Alternatives Technical Memorandum (Cayucos Sanitary District) - July 2013
Biosolids and Treatment Options Workshop Slide Presentation - September 16, 2013 (PDF)
Technical Memorandum of City's 5-year schedule - April 25, 2014
Facility Master Plan Technical Memorandum 2 Provided to WRFCAC - October 16, 2015
Facility Master Plan Technical Memorandum 3 Provided to WRFCAC - August 28, 2015
Facility Master Plan Technical Memorandum 6 Provided to WRFCAC - October 30, 2015
Facility Master Plan Technical Memorandum 7 Provided to WRFCAC - November 13, 2015
Effluent Disposal Feasibility Alternatives Study of Morro Valley - August 2016
Draft Water Reclamation Facility Master Plan - November 2016
Draft Master Water Reclamation Plan - March 2017 (Water Recycling Study)
Hydrogeologic Assessment of Chorro Valley - May 2017
Peer Review Report - June 29, 2017
V&A 2017 Sewer Flow Monitoring and Inflow/Infiltration Study - January 2018
Financial Plan & Rate Analysis for a New Water Reclamation Facility - July 5, 2018
Hydrogeological Documents
Hydrogeological Studies
Screening-Level Groundwater Modeling for Injection Feasibility - May 2017
Groundwater Modeling Update Technical Memorandum - April 2019
Characterization and Selection of Project Area - June 2020
Revised Draft Basis of Design Report – September 2023
Appendices - City of Morro Bay Basis of Design Report – September 2023
ASR Permits and Reports
Aquifer Storage and Recovery Pilot Project Permit – September 2021
Aquifer Storage and Recovery Pilot Project - July 11, 2024
Response to Comments - ASR Permit - August 22, 2024
The ASR permit compliance reports are all available on GeoTracker website at this url:
https://geotracker.waterboards.ca.gov/profile_report.asp?global_id=WDR100053984
click on ‘Site Maps/Documents’ and scroll down.
NPDES Documents
RWQCB Letter to City Council - July 11, 2017
Final NPDES Permit - Order No. R3-2017-0050 - September 27, 2017
Central Coast Regional water Quality Control Board Meeting Audio - December 7, 2017
Central Coast Regional Water Quality Control Board Meeting Minutes - December 7, 2017
NPDES Time Schedule Order R3-2018-0019 - June 27, 2018
SIP-Based NPDES - June 16, 2022
NPDES Annual Summary Report
2023 NPDES Annual Summary Report
2024 NPDES Annual Summary Report
Environmental Documents
California State Historic Preservation Office Programmatic Agreement - November 2019
Final Streambed Alteration Agreement – July 2020
United States Department of Fish and Wildlife Final Biological Opinion - March 2020
MBWRF 2023 BO Annual Status Report for USEPA and USFWS - Jan 2024
MBWRF 2024 BO Annual Status Report for USEPA and USFWS - Jan 2025
CEQA Documents
Draft Environmental Impact Report (EIR) - March 2018
Final Environmental Impact Report (EIR) - June 2018
Addendum No.1 to the Final Environmental Impact Report (EIR) - August 2019
NOI to Adopt an Addendum No.2 to the Final EIR - April 2025
Draft Addendum No. 2 to the 2018 Final EIR - April 2025
Draft Addendum No. 2 to the 2018 Final EIR Response to Comments - June 2025
Final Addendum No. 2 to the 2018 Final EIR - June 2025
State Clearinghouse: Morro Bay Water Reclamation Facility Project
The record of project approval for the Final EIR Addendum #2 from the June 24, 2025 City Council Meeting can be viewed here:
Meeting Agendas and Minutes | City of Morro Bay - Official Website
NEPA Documents
NEPA documents will be added here when available.
California Coastal Commission Documents
Coastal Development Permit Application – February 2019
Coastal Development Permit - November 2019
Special Condition No. 1 -October 2019 (Water Reclamation Facility)
Special Condition No. 2 – December 2020 (Conveyance Facilities)
Special Condition No. 2 – October 2019 (Water Reclamation Facility)
Special Condition No. 5 – June 2023 (Agricultural Mitigation Program)
Special Condition No. 6 – October 2019 (Recycled Water)
Special Conditions No. 7a – January 2023 (WWTP Removal and Restoration Plan)
Special Condition No. 8 – March 2020 (Outfall)
Special Condition No. 13 – March 2020 (Water Reclamation Facility)
Special Conditions No. 13 – December 2020 (Conveyance Facilities)
Funding/Financing Documents
Financial Plan & Rate Analysis for a New Water Reclamation Facility – July 5, 2018
Financial Plan Update for a New Water Reclamation Facility with WIFIA & SRF Financing – October 04, 2019
WIFIA
EPA WIFIA Application
WIFIA Funding Agreement (Water) - March 2020
WIFIA Funding Agreement (Sewer) - March 2020
SRF
Clean Water SRF Planning Loan Application - December 2015
Clean Water SRF Construction Funding General Application - November 2018
Clean Water SRF Planning Loan Amended Agreement - February 2019
SRF Planning Loan Amendment No.3 - June 2021
USBR Title XVI
U.S. Bureau of Reclamation Title XVI Feasibility Study - February 2020
Title XVI Grant Award and Agreement - June 2025
IRWM
Funding and Regulatory Agency Quarterly Reports
Calendar Year 2018
CY 2018 Q2 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2018 Q3 Jul-Sept Funding and Regulatory Agency Quarterly Report
CY 2018 Q4 Oct-Dec Funding and Regulatory Agency Quarterly Report
Calendar Year 2019
CY 2019 Q1 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2019 Q2 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2019 Q3 Jul-Sept Funding and Regulatory Agency Quarterly Report
CY 2019 Q4 Oct-Dec Funding and Regulatory Agency Quarterly Report
Calendar Year 2020
CY 2020 Q1 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2020 Q2 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2020 Q3 Jul-Sept Funding and Regulatory Agency Quarterly Report
CY 2020 Q4 Oct-Dec Funding and Regulatory Agency Quarterly Report
Calendar Year 2021
CY 2021 Q1 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2021 Q2 April-Jun Funding and Regulatory Agency Quarterly Report
CY 2021 Q3 Jul-Sept Funding and Regulatory Agency Quarterly Report
CY 2021 Q4 Oct-Dec Funding and Regulatory Agency Quarterly Report
Calendar Year 2022
CY 2022 Q1 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2022 Q2 April-Jun Funding and Regulatory Agency Quarterly Report
CY 2022 Q3 July-Sept Funding and Regulatory Agency Quarterly Report
CY 2022 Q4 Oct-Dec Funding and Regulatory Agency Quarterly Report
Calendar Year 2023
CY 2023 Q1 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2023 Q2 Apr-Jun Funding and Regulatory Agency Report
CY 2023 Q3 Jul-Sept Funding and Regulatory Agency Quarterly Report
CY 2023 Q4 Oct-Dec Funding and Regulatory Agency
Calendar Year 2024
CY 2024 Q1 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2024 Q2 Apr-Jun Funding and Regulatory Agency Quarterly Report
CY 2024 Q3 Jul-Sept Funding and Regulatory Agency Quarterly Report
CY 2024 Q4 Oct-Dec Funding and Regulatory Agency Quarterly Report
Calendar Year 2025
CY 2025 Q1 Jan-Mar Funding and Regulatory Agency Quarterly Report
CY 2025 Q2 Apr-June Funding and Regulatory Agency Quarterly Report
CY 2023 Q3 Jul-Sept Funding and Regulatory Agency Quarterly Report
CY 2025 Q4 Oct-Dec Funding and Regulatory Agency Quarterly Report
Budget Quarterly reports
Calendar Year 2016
Budget Report 3Q15/16 presented at 3-1-2016 WRFCAC Meeting (Item B-1)
Budget Report 4Q15/16 (thru April 30, 2016) presented at 6-7-2016 WRFCAC Meeting (Item B-2)
Budget Report 4Q15/16 (preliminary) presented at 8-2-2016 WRFCAC Meeting (Item B-2)
Budget Report 4Q15/16 presented at 10-4-2016 WRFCAC Meeting (Item B-2)
Budget Report 1Q16/17 presented at 12-6-2016 WRFCAC Meeting (Item B-1)
Calendar Year 2017
Budget Report 2Q16/17 presented at 3-7-2017 WRFCAC Meeting (Item B-2)
Summary of Consultant Contract Scopes Supplement to 3Q1617 Budget Report
Budget Report 3Q16/17 presented at 8-8-2017 City Council Meeting (Item C-2)
Budget Report 4Q16/17 presented at 12-12-2017 City Council Meeting (Item C-2)
Calendar Year 2018
None
Calendar Year 2019
March 2019 Quarterly Report
April 2019 Monthly Report
May 2019 Monthly Report
June 2019 Quarterly Report
July 2019 Monthly Report
August 2019 Monthly Report
September 2019 Quarterly Report
October 2019 Monthly Report
December 2019 Quarterly Report
Calendar Year 2020
January 2020 Monthly Report
February 2020 Monthly Report
March 2020 Quarterly Report
April 2020 Monthly Report
May 2020 Monthly Report
June 2020 Quarterly Report
July 2020 Monthly Report
August 2020 Monthly Report
September 2020 Quarterly Report
Calendar Year 2021
March 2021 Quarterly Report
June 2021 Quarterly Report
October 2021 Quarterly Report
December 2021 Quarterly Report
Calendar Year 2022
CY 2022 Q1 Jan-Mar Budget Report
CY 2022 Q2 Apr-June Budget Report
CY 2022 Q3 Jul-Sept Budget Report
CY 2022 Q4 Oct-Dec Budget Report
Calendar Year 2023
CY 2023 Q1 Jan-Mar Budget Report
CY 2023 Q2 Apr-Jun Budget Report
CY 2023 Q3 & Q4 Jul 2023 - Jun 2024 Budget Report
Calendar Year 2024
CY 2024 Q1 & Q2 Jul 2023 - Jun 2024 Budget Report
CY 2024 Q3 July-Sept Budget Report
CY 2024 Q4 Oct-Dec Budget Report
Calendar Year 2025
CY 2025 Q1 Jan-Mar Budget Report
CY 2025 Q2 Apr-June Budget Report
CY 2025 Q3 July-Sept Budget Report
CY 2025 Q4 Oct-Dec Budget Report
Consultant Contracts and Procurement
Recycled Water Organizational Chart
Consultant Procurement
City Meetings Related to Consultant Procurement
City Council Meeting - February 25, 2026
• 6.f - Water Reclamation Facility Quarterly Report and Contract Amendments (Rincon Amendment #2, KMA Amendment #5, and GSI Amendment #6)
Public Works Advisory Board - February 18, 2026
• 7.e - Receive Fiscal Year 2026 Quarter 2 Water Reclamation Facility Program Quarterly Report and Provide a Recommendation to City Council Regarding Proposed Professional Services Agreement Amendments (Rincon Amendment #2, KMA Amendment #5, and GSI Amendment #6)
City Council Regular Meeting - June 24, 2025
• 7.h - WRF Quarterly Report, Recycled Water Conceptual Design Report, WRF EIR Addendum #2, Recycled Water Implementation Strategy, and Contract Amendments (ConfluenceES, GSI, and Far Western)
• 7.i - Approval of Professional Services Agreement with Anchor QEA for the Wastewater Treatment Plant Decommissioning and Demolition Engineering Design
City Council Regular Meeting - August 13, 2024
• 9.a - Professional Services Agreement for Hydrogeologic Support for the Recycled Water Program at the Morro Basin Extraction Well Project (GSI agreements)
City Council Regular Meeting - June 11, 2024
• 7.b - Professional Services Agreement/Amendments for Engineering Support for the implementation of the Recycled Water Component of the Water Reclamation Facility Program (Cannon – Recycled Water Facilities Design Agreement, ConfluenceES, Carollo, and GSI)
City Council Regular Meeting - April 09, 2024
• 9.a - Approval of Contract Closeout Amendment No. 10 for FBV Agreement
• 9.b - Approve WRF Close-out Agreement Contract Amendment for Anvil Builders, Inc. and Settlement Agreement
Public Works Advisory Board – February 21, 2024 (for minutes, click here)
• B-1 - Contract Closeout Agreement (FBV) for the Water Resources Center
Special Joint Meeting of the City Council and Public Works Advisory Board – November 14, 2023 (for minutes, click here)
• I - Phase 1 Implementation Strategy Recommendation for the WRF Recycled Water Program and Associated Contract Amendments (KMA, Far Western, Rincon, GSI)
City Council Special Meeting – May 24, 2023 (for minutes, click here)
• II - Approve WRF Contract Amendments (Anvil, FBV, Cogstone, Carollo, and ConfluenceES) and Review and Comment on Fiscal Year 2023 Quarter 3 WRF Quarterly Report
Public Works Advisory Board – May 17, 2023 (for minutes, click here)
• A-3 -Review of Water Reclamation Facility Program (WRF) Fiscal Year 22-23 Q3 WRF Quarterly Report and Contract Amendments (Anvil, FBV, and Cogstone)
City Council Regular Meeting – February 28, 2023 (for minutes, click here)
• C-3 - Approve WRF Contract Amendments (Anvil, Waterworks, and Rincon), Authorize an Increase in the Anvil Contract Budget and Review and Comments on Fiscal Year 2023 Quarter 2 WRF Quarterly Report
Public Works Advisory Board – February 15, 2023 (for minutes, click here)
• A-4 - Review of Water Reclamation Facility Program (WRF) Contract Amendments (Anvil, Waterworks, and Rincon) and Fiscal Year 2023 Q2 WRF Quarterly Report
Public Works Advisory Board - November 16, 2022 (for minutes, click here)
• I. - Review of Water Reclamation Facility Program (WRF) Contract Amendments (Anvil Amendment #6, FBV Amendment #8, and Cogstone Amendment #3) and Fiscal Year 22–23 Q1 WRF Quarterly Report
Public Works Advisory Board - August 17, 2022 (for minutes, click here)
• A-3 - Water Reclamation Facility Program Quarter 4 Fiscal Year 2022 Quarterly Report and Contract Amendments (Carollo Amendment #7, Waterworks Amendment #4, KMA Amendment #2, Anvil Amendment #5, and FVB Amendment #8) for the WRF Project
City Council Regular Meeting - August 23, 2022 (for minutes, click here)
• C-2 - Approve WRF Contract Amendments (Carollo Amendment #7, Waterworks Amendment #4, KMA Amendment #2, Anvil Amendment #5, and FVB Amendment #8) and Review and Comments on Fiscal Year 21-22 Q4 WRF Quarterly Report
City Council Special Meeting - June 28, 2022 (for minutes, click here)
• III. - Approve of Amendment No. 7 to the Water Reclamation Facility (WRF) Design-Build Contract with Filanc Black & Veatch
Public Works Advisory Board - June 15, 2022 (for minutes, click here)
• A-3 - Review of Water Reclamation Facility (WRF) Contract Amendments (Cogstone Amendment #2, Far Western Amendment #7, Anvil Amendment #4, Carollo Amendment #6)
City Council Regular Meeting - June 14, 2022 (for minutes, click here)
• C-3 - Authorize the City Manager to execute 1) Amendment No. 2 to contract with Cogstone Resource Management; 2) Amendment No. 7 to contract with Far Western Anthropological Research Group, Inc.; 3) Amendment No. 4 to contract with Anvil Builders for the WRF Lift Station and Offsite Pipelines Construction Project; and 4) Amendment No. 6 to Carollo Engineers, Inc.
City Council Regular Meeting - April 26, 2022 (for minutes, click here)
• C-4 - Water Reclamation Facility (WRF) Program – Recycled Water Facilities – Injection Well No. 1 Contract Award (Pacific Coast Well Drilling Inc. (PCWD)) in the Amount of $346,725.00
City Council Regular Meeting April 12, 2022 (for minutes, click here)
• A-8 - Water Reclamation Facility (WRF) Program – Recycled Water Facilities – Injection Well No. 1 (Contract Award Pacific Coast Well Drilling Inc. (PCWD)) in the Amount of $346,725.00
City Council Regular Meeting - March 22, 2022 (for minutes, click here)
• C-1 - Approval of Amendment No. 3 to the contract with Anvil Builders, Inc., for construction services for the Water Reclamation Facility (WRF) Lift Station and Offsite Pipelines
Public Works Advisory Board - January 19, 2022 (for minutes, click here)
• B- 1 - Amendment No. 3 to Contract with Water Works Engineers, LLC for Engineering Design Services During Construction for the Water Reclamation Facility (WRF) Lift Station and Offsite Pipelines; and Amendment No. 2 to Contract with Anvil Builders, Inc., for Construction Services for the WRF Lift Station and Offsite Pipelines
City Council Regular Meeting - January 11, 2022 (for minutes, click here)
• C-2 Approval of Amendment No. 3 to the contract with Water Works Engineers, LLC for engineering design services during construction for the Water Reclamation Facility Lift Station and Offsite Pipelines; and Approval of Amendment No. 2 to the contract with Anvil Builders, Inc., for construction services for the Water Reclamation Facility (WRF) Lift Station and Offsite Pipelines
City Council Regular Meeting - October 12, 2021 (for minutes, click here)
• C-1 - 1) Approval of Amendment to Contract with Cogstone Resources Management for Cultural Resources Monitoring for the Water Reclamation Facility (WRF) Lift Station and Offsite Pipelines Construction Project; 2) Amendment to Contract with Far Western Anthropological Research Group, Inc. for Data Recovery Excavations at Site CA-SLO-16 for the WRF Lift Station and Offsite Pipelines Construction Project; and 3) Approval of Change Order No. 1 to Contract with Anvil Builders, Inc. for Construction Services for the Water Reclamation Facility (WRF) Lift Station and Offsite Pipelines
City Council Regular Meeting - August 24, 2021 (for minutes, click here)
• C-1 - Review Water Reclamation Facility (WRF) Quarterly Update Report and Approval of Contract Amendments
Public Works Advisory Board - August 18, 2021
• B-2 Review of Potential Change Orders (PCO) for the Water Reclamation Facility Project (FBV and Anvil)
City Council Meeting - June 22, 2021 (for minutes, click here)
• C-2 - Approval of Amendment No. 4 to the Water Reclamation Facility Program Management Contract (Carollo) and Authorization for the Public Works Director to Sign the Agreement to Cover Planned Program Management Costs for Fiscal Year 2021/2022
City Council Meeting - March 9, 2021 (for minutes, click here)
• C-2 - Water Reclamation Facility (WRF) Project Review and Approval of Change Orders (Amendment No. 5 to the Existing Amended Agreement with Filanc-Black & Veatch)
City Council Meeting - February 23, 2021 (for minutes, click here)
• C-3 - Consideration of Amendment to an Existing Contract with Far Western Anthropological Research Group, Inc. (Far Western) for Additional Archeological Pre-Construction Investigations and Mitigation Services for the Water Reclamation Facility (WRF) Lift Stations and Offsite Pipelines Construction
Public Works Advisory Board - February 17, 2021 (for minutes, click here)
• B- 2 - Review of Potential Change Orders (PCO) for the Water Reclamation Facility (FBV)
City Council Meeting - January 12, 2021 (for minutes, click here)
• C-2 - Consideration of Proposal and Approval of Contract with Cogstone Resource Management, Inc. (Cogstone) for Archeological and Paleontological Monitoring Services for the Water Reclamation Facility (WRF) Lift Stations and Offsite Pipelines Construction
• C-3 - Consideration of Proposal and Approval of Contract with Kevin Merk Associates, LLC (KMA) for Biological Monitoring Services for the Water Reclamation Facility (WRF) Lift Stations and Offsite Pipelines Construction
City Council Meeting - May 26, 2020 (for minutes, click here)
• C-1 - Review and Approve Potential Change Orders (FBV) for the Water Reclamation Facility (WRF); Review and Receive the WRF Capital Project Quarterly Update Report; and Review and Approve Proposed Good Faith Local Hire Provisions for Bid Documents for the Remaining WRF Project Components, Including an Amount for Liquidated Damages Related Thereto
• Presentation (PCO Review)
Public Works Advisory Meeting - May 20, 2020 (for minutes, click here)
• B-2 - Review of Potential Change Orders (PCO) (FBV) for the Water Reclamation Facility
• Presentation (PCO Review)
City Council Meeting - January 28, 2020 (for minutes, click here)
• C-1 - Review WRF Capital Project Quarterly Update Report and Potential Modification to the Report, Review Roles of the Public Works Advisory Board (PWAB) and Citizens Finance Advisory Committee (CFAC) Regarding the WRF, and Adopt Resolution No. 08-20 Authorizing a Budget Adjustment for Temporary Part-Time Staffing to Assist with Records Management for the Project
• C-2 - Approval of Amendment No. 2 to Far Western’s Contract and Authorization for the Public Works Director to Sign the Agreement
• Presentation
City Council Meeting - November 6, 2019 (for minutes, click here)
• II - Approval of Amendment No. 2 to the Water Reclamation Facility Program Management Contract (Carollo) and Authorization for the Public Works Director to Sign the Agreement
City Council Meeting - September 10, 2019 (for minutes, click here)
• C-1 - Approval of Amendment to Contract with Water Works Engineers, LLC for Engineering Design Services for the Water Reclamation Facility (WRF) Lift Station and Offsite Pipelines
• WWE
Special City Council Meeting - May 14, 2019 (for minutes, click here)
• C-1 - Review and Approval of Basis of Design Report (BODR), Potential Change Orders (PCO) (FBV), and Increase of the Guaranteed Maximum Price (GMP) for the Water Reclamation Facility; (Public Works)
•Presentation
WRFCAC Meeting - May 9, 2019 (for minutes, click here)
• III - WRF Project Update
• IV - Review Basis of Design Report (BODR) and
Potential Change Orders (PCO) (FBV) or the Water Reclamation Facility
• Presentation
City Council Meeting - March 12, 2019 (for minutes, click here)
• A-4 - Approve New Consultant Agreement (Environmental Associates Inc. (ESA)) and Amendment (Kestrel Consulting) Needed to Support the Water Reclamation Facility Project; (Public Works)
City Council Meeting - November 27, 2018 (for minutes, click here)
• C- 1- Approval of Water Reclamation Facility Program Management Contract Amendment No. 1 (Carollo)
• Presentation
City Council Meeting - October 23, 2018 (for minutes, click here)
• C-1 - Approval of Contract with Filanc/Black & Veatch for Design and Construction of the New Water Reclamation Facility
• Presentation
WRFCAC - June 12, 2018 (for minutes, click here)
• Design Build Team Selection Recommendation (FBV)
• Presentation
• Audio/Video
City Council Meeting - April 10, 2018 (for minutes, click here)
• C-1 - Award of Contract for Professional Services: Program Management for the Morro Bay Water Reclamation Facility Project to Carollo Engineers
City Council Meeting - January 23, 2018 (for minutes, click here)
• C-2 - Authorize Release of a Request for Proposal (RFP) for Design/Build of the City of Morro Bay Water Reclamation Facility Onsite Improvements to Three Pre-Qualified Design-Build Entities That Submitted Statements of Qualifications (SOQ) in Accordance With the Request for Qualifications (RFQ) Issued on October 27, 2017
City Council Special Meeting - January 17, 2018 (for minutes, click here)
• I- Discuss and Provide Direction on the Draft Request for Proposals for WRF Onsite Improvements
• Presentation - Draft Design-Build RFP
WRFCAC Meeting - January 11, 2018 (for minutes, click here)
• B-1 Draft Request for Proposals for WRF Onsite Improvements
• Presentation - Draft Design-Build RFP
City Council Meeting - January 9, 2018 (for minutes, click here)
• C-1 - Review of and Direction for Water Reclamation Facility (WRF) Program Management Structure and Provide Other Comments and Direction as Deemed Appropriate
WRFCAC Meeting - January 4, 2018 (for minutes, click here)
• B-1 - Draft Request for Proposals for WRF Onsite Improvements
• B-2 - Review of Program Management Structure
• Presentation - Draft Design-Build RFP
WRFCAC Meeting - December 5, 2017
• B-1 - Fiscal Year End 2016/17 Financial Report
• B-2 - WRF Status Report
• B-3 - Overview of Design-Build RFP Development Process
• Minutes
• Presentation
City Council Meeting - November 14, 2017
• A-8 - Confirm Water Reclamation Facility (WRF) Project Goals as Modified at the October 24, 2017 City Council Meeting; (Public Works)
• C-2 - Consideration of Proposal by and Approval of Contract with Water Works Engineers for Engineering Design Services for the Water Reclamation Facility (WRF) Lift Station and Offsite Pipelines; (Public Works)
• Minutes
City Council Meeting - October 24, 2017
• C-4 - Water Reclamation Facility (WRF) Project Goal, with Changes Deemed Appropriate, and Authorization to Advertise the Design‑Build Request for Qualifications (RFQ); (Public Works)
• Minutes
City Council Meeting - February 28, 2017
• C-1 - Approve the Annual Contract Authorization for Program Management Services for the Water Reclamation Facility as Contemplated by the Agreement Between the City and Michael K. Nunley & Associates, Inc. (Public Works)
• Agenda
• Minutes
City Council Meeting - January 24, 2017
• A-5 - Receive and Approve the Annual Contract Authorization for Program Management Services for the Water Reclamation Facility as Contemplated by the Agreement Between the City and Michael K. Nunley & Associates, Inc. (Public Works)
• Agenda
• Minutes
WRFCAC Meeting - January 3, 2017
• B-1 - Program Status Update
• B-2 Request for Proposal – Engineering Services for WRF Lift Station, Force Main, and Brine/Wet Weather Disposal Pipeline
• B-3 -Contract Amendment for Program Management Services
• Agenda
• Minutes
City Council Meeting - June 14, 2016
• C‑3 - Selection of Tri‑W (South Bay Boulevard) as Preferred Site for Planning and Permitting of New WRF and Amendment to Agreement with Black & Veatch Corporation; (Public Works)
• Agenda
• Agenda Correspondence
• Minutes
WRFCAC Meeting - October 6, 2015
• A-2 -Water Reclamation Facility Funding Update
• A-3 - WRF Status Report
• A-4 - Upcoming Outreach Opportunities
• B-1 - WRFCAC Sub-Committee Updates and Recommendations Finance, Environmental and Engineering Sub-Committees to present their analyses and findings to the entire committee.
• C-1 - Discuss Status of CEQA/NEPA consultant and review scope/budget (Environmental Science Associates (ESA))
• Agenda
• Minutes
City Meetings
See the meetings page for a list of meetings related to the Water Reclamation Facility Project organized by date with links to the agendas/minutes or relevant meeting materials.
WRF Siting Studies
Siting Studies
Community Workshop #1 Map Exercise Input By Site Location - August 15, 2013
Draft Options Report - October 29, 2013
Second Draft Options Report - December 5, 2013
Second Draft Options Report California Coastal Commission Comments - December 10, 2013
Second Draft Options Report Council Presentation - December 10, 2013
Report on Reclamation and Council Recommended WRF Sites - May 8, 2014
CMC Capacity Evaluation Presentation - December 9, 2014
CMC and Rancho Colina Site Comparison City Council Presentation - December 9, 2014
Comparative Site Analysis: CMC vs Rancho Colina Final Report - December 9, 2014
Staff Report - WRF Review and Direction - March 8, 2016
Staff Report Update of Potential WRF Sites - May 5, 2016
Final Updated WRF Site Report - September 21, 2017